Moonbase
← Back to Funding Opportunities
SAM.govDEPT OF DEFENSE — DEPT OF THE ARMY

MEARNG F550 Emergency Light Installation

Posted Aug 21, 2026·open

AGENCY

DEPT OF DEFENSE

PROGRAM

Solicitation

AMOUNT

CLOSES

Sep 16, 2026

Description

The Maine Army National Guard (MEARNG) requires the professional installation of a complete, government-furnished, emergency response vehicle police-style flashing light system and a battery charging system onto a Government-owned Ford F-550 Vehicle Mounted Radiation Detection System (VMRDS). The contractor shall provide all necessary personnel, tools, materials (excluding specified government-furnished equipment), and expertise to complete the installation. Scope of Work: The contractor is required to perform the following installations and integrations on the Ford F-550 vehicle: Equipment Installation: Install all Government-Furnished Equipment (GFE) at specified locations. This includes a Whelen Inner Edge light assembly, a Whelen Core and Controller unit, and various Whelen body, slim, and trio lights. System Integration: Professionally integrate all lighting components with the central controller. All wiring must be routed, secured, protected with grommets where necessary, and concealed appropriately. Power System Installation: Install one Kussmaul battery tender complete with an auto-eject shore power connection to charge the vehicle's batteries. Functional Testing: Conduct a full functional test of the integrated lighting system and the power system in the presence of a Government representative to demonstrate proper functionality. Vehicle Restoration: Upon completion, repair any damage to the vehicle resulting from installation activities and ensure all work areas are cleaned of debris, materials, and tools. Government Furnished Equipment (GFE): The Government will provide the following major components for installation: One (1) Whelen Inner Edge light assembly One (1) Whelen Core and Controller unit Two (2) Whelen slim lights (for front grill) Eight (8) Whelen body lights Two (2) Whelen trio lights Two (2) Whelen slim lights (for front fenders) One (1) Kussmaul battery tender Contractor Requirements: Provide all personnel, equipment, tools, materials (except GFE), and supervision. Ensure all employees possess the required skillsets or licensing to install the lighting system according to manufacturer specifications. The place of performance will be the contractor's installation facility. The period of performance for the installation shall not exceed one week. Period of Performance: The work must be completed within one (1) week from the start date. Questions: May be submitted to the points of contact below. The due date for questions is 09SEP2026. Submission Instructions: All quotes must be submitted via email to the Contract Specialist, Thomas J. Ryan, at thomas.j.ryan36.civ@army.mil and the Contracting Officer, Darlene Howes, at darlene.r.howes.civ@army.mil. Quotes must include a completed SF 1449 and a separate Technical Proposal responding to the evaluation criteria outlined in the FAR 52.212-1 and 52.212-2 Addenda.

Eligibility

Small Business Set Aside - Total

Contact

Thomas Ryan

thomas.j.ryan36.civ@army.mil

2074305297

Additional details

Sub-tier
DEPT OF THE ARMY
Office
W7NC USPFO ACTIVITY ME ARNG
NAICS code
811111
Set-aside
SBA
Place of performance
Augusta, ME, 04330, USA
Archived
Oct 1, 2026

Opportunity number: W912JD26QA025

Search this number on SAM.gov Contract Opportunities for the official listing.