← Back to Funding Opportunities
SAM.govTRANSPORTATION, DEPARTMENT OF — FEDERAL AVIATION ADMINISTRATION
6973GH-26-Q-00131 ASR-9 Beacon Cable Kits
Posted Aug 26, 2026·open
AGENCY
TRANSPORTATION, DEPARTMENT OF
PROGRAM
Solicitation
AMOUNT
—
CLOSES
Sep 11, 2026
Description
1. BACKGROUND The Federal Aviation Administration (FAA) has identified a requirement to procure conversion kits to support modifications to the Air Traffic Control Beacon Interrogator (ATCBI-5) configuration at Airport Surveillance Radar Model 9 (ASR-9) facilities as part of the Brand-New Air Traffic Control System (BNATCS) implementation under the Radar System Replacement (RSR) Program. The rotary joints currently installed at ASR-9/ATCBI-5 sites do not provide the number of signal paths required to support integration with the RSR architecture. To achieve compatibility, the existing rotary joints must be converted to the configuration utilized at ASR-9 sites equipped with the Mode Select Beacon System (Mode-S). This conversion requires the installation of a kit developed by AJW-1433, which replaces the existing beacon cables. 2. CONTRACTING OFFICER�S REPRESENTATIVE (COR): The COR formally designated this responsibility by the Contracting Officer to provide direction and Government oversight to the contractor on matters related to this contract. The COR is: Brandon Brumley AJW-L910, Radar Technical and Program Support Branch 3. SCOPE OF WORK The contractor must furnish all labor, facilities, equipment, and materials to fabricate a kit as outlined in each section that follows. A. CLIN 001 � One (1) First Article Unit - Shall be delivered 90 days After Receipt of Order B. CLIN 002 � Option to purchase up to nineteen (19) Production Units after first article approval 4. REQUIREMENTS 4.1 Design, Construction, and Testing The contractor shall procure and package the parts listed in Attachment 1 � Parts List into a Kit. 4.2 First Article Unit Delivery Contractor must deliver one verification unit. Delivery shall occur no later than (NLT) ninety (90) days at receipt of order (ARO). 4.3 Verification Unit Analysis Upon receipt of first article unit, FAA shall perform visual inspection to determine conformance to Attachment 1 � Parts List. FAA will have 30 days to accept or reject first articles. 4.4 Production Units Once approval is provided for the first article unit, the contractor shall be considered an approved source of production units. The number of units for production is nineteen (19). Delivery of production units shall occur NLT 180 days after notification of First Article Approval. 5. PREPARATION FOR DELIVERY 5.1 Preservation, Packaging, and Packing Preservation, packaging, and packing shall be IAW Provision 61.
Eligibility
Small Business Set Aside - Total
Contact
Raymond Lena
raymond.a.lena@faa.govAdditional details
- Sub-tier
- FEDERAL AVIATION ADMINISTRATION
- Office
- 6973GH FRANCHISE ACQUISITION SVCS
- NAICS code
- 334419
- Set-aside
- SBA
- Place of performance
- Oklahoma City, OK, 73169, USA
- Archived
- Sep 26, 2026
Opportunity number: 6973GH-26-Q-00131_ASR-9_Beacon_Cable_Kits
Search this number on SAM.gov Contract Opportunities for the official listing.